← Back to Home Log In / Register
Incident Response • NDPA 2023 Section 40 • 72-Hour Statutory Mandate

Data Breach Response Plan

Effective Date: October 25, 2026 • Supervising Authority: Nigeria Data Protection Commission (NDPC) • Version: 2026.1 (Pilot Ready)
STATUTORY INCIDENT REPORTING MANDATE:
Pursuant to Section 40 of the Nigeria Data Protection Act (NDPA) 2023 and the CBN Cybersecurity Guidelines, Collekt Technologies Ltd enforces a strict operational protocol for detecting, containing, investigating, documenting, and reporting security incidents. A confirmed breach likely to result in a risk to Data Subjects must be reported to the Nigeria Data Protection Commission (NDPC) within seventy-two (72) hours of identification.

1. Objectives & Breach Definition

A "Personal Data Breach" refers to any security incident leading to the accidental or unlawful destruction, loss, alteration, unauthorized disclosure of, or access to personal data transmitted, stored, or otherwise processed by Collekt or its sub-processors.

The primary objectives of this Plan are:

2. Incident Response Team (IRT) Structure

The Collekt Incident Response Team (IRT) is activated immediately upon a suspected breach:

IRT Role Primary Function Key Responsibilities
Incident Commander (CTO / Head of Engineering) Technical Command Directs technical containment, isolation of servers, key rotation, and forensic backup.
Data Protection Officer (DPO) Regulatory & Compliance Lead Assesses severity, leads statutory filings with NDPC, and drafts data subject notices.
Forensic Security Engineer Evidence & Threat Analysis Analyzes WORM audit logs, reconstructs breach vector, ensures forensic chain of custody.
Legal Counsel Statutory Compliance Advises on Evidence Act 2011 admissibility, CBN reporting, and contractual liabilities.
Corporate Communications Lead Stakeholder Disclosures Manages transparent communication to affected pilot users, media, and partners.

3. Severity Classification Matrix

4. Phase 1: Detection & Triage (0 – 2 Hours)

Incidents are identified via automated telemetry, anomalous API spike alarms, webhook signature failures, or vulnerability disclosure to compliance@collektng.com:

5. Phase 2: Containment & Forensic Eradication (2 – 12 Hours)

6. Phase 3: Statutory 72-Hour Reporting to the NDPC

Pursuant to Section 40(1) of the NDPA 2023, if an assessment indicates a likely risk to the rights and freedoms of Data Subjects, Collekt must notify the Nigeria Data Protection Commission (NDPC) within seventy-two (72) hours.

NDPC Statutory Breach Notification Dossier:
1. Nature of the personal data breach, including categories and approximate number of Data Subjects.
2. Contact details of the Collekt Compliance Office (compliance@collektng.com).
3. Likely consequences and assessed risks of the breach.
4. Measures taken or proposed to contain, mitigate, and remediate the incident.

7. Data Subject Notification Protocol

Pursuant to Section 40(3) of the NDPA, where a breach presents a high risk to users (such as financial credential exposure or identity theft risk):

8. Phase 4: Root Cause Analysis (RCA) & Remediation

Within fourteen (14) calendar days of breach closure, the IRT submits a formal Root Cause Analysis (RCA) and Corrective Action Plan (CAPA) to the Board of Directors and the NDPC, covering code patches, enhanced RLS rules, and employee refresher training.

9. Tabletop Exercises & Continuous Testing

The IRT conducts mandatory semi-annual simulated breach tabletop drills (covering escrow bypass, KYC data leakage, and DDoS extortion scenarios) to ensure operational readiness.